The masons continue to make progress on the two chimney masses, with the living room / terrace mass reaching past the second floor this week. From the roof deck here, you can see the two ceramic flues, for the living room and terrace fireplaces, and also the ducts for two of the bathroom exhaust fans. Click to see progress on the masonry throughout.
Clockwise from top-left: living room, dining room, porch (flip side of dining room), master bedroom (above dining room).
Comments