The excavation team is making good use of the spring weather to clean up the site so terrace and patio masonry work can get underway. Here, pipe is being laid to tie-in the house downspouts to the concrete drainage galleries. The trenches will be back-filled and the area will be rough graded soon after.
top of page
bottom of page
Comments