Framing at the east end of the house is moving along at full speed, at least when it's not raining. Here we see the view from the kitchen through the dining room....
Framing work will move up to the second floor of the east end this week, while framing for the west end and center living room areas are on hold pending installation of structural steel columns the second week of March. Since these columns are both structural and decorative (they will be visible in the living room), they are being fabricated by a specialist and color-matched with the steel windows and therefore were not installed with the rest of the steel.
Comments