top of page
Search
Writer's picturePeter Armstrong

Forming the Footings

Two weeks in and the excavator has finished prepping the house footprint, taking us down to about 2.5 feet on average below proposed bottom of footing level by removing materials not suitable for foundation bearing. Foundation excavations were backfilled to bottom of footing level with 3/4" crushed stone and compacted with a minimum of four passes with a Rex 700 vibratory drum roller.


The footprint has been laid out and the footing forms are starting to come together. Hoping to start pouring concrete before end of week.


15 views0 comments

Recent Posts

See All

Comments


bottom of page