top of page
Search
Writer's picturePeter Armstrong

Ready to Pour

A retaining wall to hold back a 2.5' grade change between the small fireplace terrace and the pool surround has been formed on top of the footing poured earlier in the month. Weather permitting, the mixer and pumper trucks will be on site early in the week.

The wall will also serve as a bench to provide built-in poolside seating.



18 views0 comments

Recent Posts

See All

Comments


bottom of page