The site work continues. Here you can see where slabs have been formed and rebar has been laid at either end of the pool (which is covered by plywood). The concrete for these slabs is scheduled to be poured later today.
The slab for the upper fireplace terrace outside the living room, the steps down to the pool, and the retaining wall have already been poured. Note the 2" PVC pipes protruding from the slab in a 2' on-center grid pattern. The Swiss-cheese holes in the slab will create water escapeways, turning our granite paver terrace set on an impervious concrete slab into a pervious condition as required by the local conservation commission.
Comentarios