top of page
Search
Writer's picturePeter Armstrong

Spa Time


The steel shop drawings were approved Monday so material has been ordered. Fabrication will begin next week for delivery and erection mid-January.


In the meantime, the spa jets are all in place and ready to be set in concrete. Sixteen jets in total: a triple lower back unit on each of the side benches plus one set at calf height just below, three individual jets on each of the north and south benches set at two different elevations for kids and adults, and two in the floor for achy feet. Just waiting for the gunite guy to confirm a date.


gun·ite /ˈɡənīt/

noun a mixture of cement, sand, and water applied through a pressure hose, producing a dense hard layer of concrete used in construction for lining tunnels, structural repairs, and forming pools

13 views0 comments

Recent Posts

See All

Comments


bottom of page