Under Pressure


The main trunk supply and return lines for the hydronic radiant heating system were installed while the crawl space is still easily accessible. The lines were wrapped in insulation and hung from the first deck joists, then put under 100 psi of air pressure to test for leaks. First floor decking will be installed in the next few days, weather permitting.